Nexpoint Logistics
Truck with a container crossing a highway tunnel

What nobody explains until you've already been charged.

Articles on foreign trade in everyday words: why a shipment is held, what each day of waiting costs, and what could have been solved before shipping.

Category

7 articles · written by Hank Dávalos

September 24, 2026 · 3 min read

Before, at and after the crossing: the three stages of an import

An import is not a single procedure: it is three stages with different deadlines and different people responsible. Almost everything that goes wrong is decided in the first one and charged in the second.

More articles

Your casenot here?

Tell us what held your freight. If it makes an article, we'll write it; if it makes a call, we'll book it.